Power

SNC-Lavalin's Power Group has nearly 100 years of experience in more than 120 countries. It is ranked first in Canada and recognized internationally as a leader in engineering and construction in the fields of hydroelectric, nuclear and thermal power generation, power system studies, power sector reform, transmission and distribution projects and energy control systems.

SNC-Lavalin's power projects represent an installed capacity of nearly 380,000 MW, more than 110,000 km of transmission and distribution lines and some 1,500 substations. The Power Group also owns and operates several generation and transmission facilities, a number of which it designed, built and financed.

SNC-Lavalin offers full engineering, procurement and construction services on a cost reimbursable and lump-sum turnkey basis. It also arranges financing and participates in ownership.

Projects Contacts

Hydro Brilliant Expansion Project

SNC-Lavalin successfully designed, constructed and commissioned the Brilliant Expansion Project (BEP), a 120 MW hydropower plant on the Kootenay River in British Columbia, while ensuring adherence to an Environmental Management Plan. Sustainability considerations were a keystone in the conception, design and construction of the project. The key environmental sustainability features of the project included a reduced footprint and visual impact, advances in sturgeon research, reduced fish mortality, maintained Brilliant Hole and improved fish habitat.

Country : Canada

Chute-à-Caron Rehabilitation Project

Constructed between the years 1926 and 1931, the Chute-à-Caron hydroelectric development is located on the Saguenay River, 40 km downstream from St-Jean Lake, in Quebec. It is part of the Shipshaw Complex which also comprises the Shipshaw power station, located 2.5 km downstream.The project involved rehabilitating the concrete dams and other structures of the Chute-a-Caron development, related to civil, mechanical and electrical works to ensure their performance for at least another 30 years. It also included a reevaluation of the stability of all concrete structures.The mandate also included an evaluation of the condition of the hydraulic passages of the four turbine-generator units. The electrical and mechanical components of the spillway gate gantry crane were evaluated and inspected. Finally, an evaluation of the dam monitoring system was also part of the mandate. Client: Hydro-Québec

Country : Canada

Bruce Power Nuclear Plant

We have two projects underway at Bruce Power's nuclear plant in Ontario The first is a plant refurbishment project, and the second is to replace sixteen 100 tonne steam generators. For the second mandate, we developed a new steam generator removal process that reduces costs and removal/replacement time. Client: Bruce Power

Country : Canada

Southeastern Europe Electrical System

SNC-Lavalin, funded by the Canadian International Development Agency (CIDA),  supported countries in the Balkan Region to improve the management, delivery and rational use of electricity in the Balkan Region. The project was completed through a series of work plans organized by the following areas: regional market development and activities, energy strategies, policies and sector organization, power regulation, power systems operation and organization, environmental activities and human resources development. Region: Southeastern Europe

Country :

Skikda Combined Cycle Power Plant

Our team on the Skikda thermal project in Algeria overcame several challenges to meet an urgent power provision deadline, including a demanding schedule, severe space constraints and 40 straight days of rain that delayed work by a full month. Nonetheless, they met their deadline to the client's satisfaction with no lost time incidents. Client: Shariket Kahraba Skikda SKS SPA

Country : Algeria

Three Sisters Underground Conversion

At the Three Sisters Mountain Village Resort in Canada's Rocky Mountains, we converted two overhead transmission lines to underground high-voltage cable encased in concrete duct banks. Construction challenges included abandoned shallow mineshafts, sinkholes and special wildlife precautions. Client: Three Sisters Mountain Village

Country : Canada

Hydro Brilliant Expansion Project

SNC-Lavalin successfully designed, constructed and commissioned the Brilliant Expansion Project (BEP), a 120 MW hydropower plant on the Kootenay River in British Columbia, while ensuring adherence to an Environmental Management Plan. Sustainability considerations were a keystone in the conception, design and construction of the project. The key environmental sustainability features of the project included a reduced footprint and visual impact, advances in sturgeon research, reduced fish mortality, maintained Brilliant Hole and improved fish habitat.

Chute-à-Caron Rehabilitation Project

Constructed between the years 1926 and 1931, the Chute-à-Caron hydroelectric development is located on the Saguenay River, 40 km downstream from St-Jean Lake, in Quebec. It is part of the Shipshaw Complex which also comprises the Shipshaw power station, located 2.5 km downstream.The project involved rehabilitating the concrete dams and other structures of the Chute-a-Caron development, related to civil, mechanical and electrical works to ensure their performance for at least another 30 years. It also included a reevaluation of the stability of all concrete structures.The mandate also included an evaluation of the condition of the hydraulic passages of the four turbine-generator units. The electrical and mechanical components of the spillway gate gantry crane were evaluated and inspected. Finally, an evaluation of the dam monitoring system was also part of the mandate. Client: Hydro-Québec

Bruce Power Nuclear Plant

We have two projects underway at Bruce Power's nuclear plant in Ontario The first is a plant refurbishment project, and the second is to replace sixteen 100 tonne steam generators. For the second mandate, we developed a new steam generator removal process that reduces costs and removal/replacement time. Client: Bruce Power

Southeastern Europe Electrical System

SNC-Lavalin, funded by the Canadian International Development Agency (CIDA),  supported countries in the Balkan Region to improve the management, delivery and rational use of electricity in the Balkan Region. The project was completed through a series of work plans organized by the following areas: regional market development and activities, energy strategies, policies and sector organization, power regulation, power systems operation and organization, environmental activities and human resources development. Region: Southeastern Europe

Skikda Combined Cycle Power Plant

Our team on the Skikda thermal project in Algeria overcame several challenges to meet an urgent power provision deadline, including a demanding schedule, severe space constraints and 40 straight days of rain that delayed work by a full month. Nonetheless, they met their deadline to the client's satisfaction with no lost time incidents. Client: Shariket Kahraba Skikda SKS SPA

Three Sisters Underground Conversion

At the Three Sisters Mountain Village Resort in Canada's Rocky Mountains, we converted two overhead transmission lines to underground high-voltage cable encased in concrete duct banks. Construction challenges included abandoned shallow mineshafts, sinkholes and special wildlife precautions. Client: Three Sisters Mountain Village