Industry
SNC-Lavalin offers full engineering, procurement, construction and project management services to clients in the light industrial (consumer products, food processing, electronics, automotive, manufacturing) and secondary processing (steel, cement, glass, industrial gases) sectors, from process development and design to plant commissioning and start-up. It also offers full services in instrumentation and automation of industrial processes across all its sectors of activity.
SNC-Lavalin has successfully completed numerous grassroots facilities, as well as plant expansion, modernization and revamp projects, where it focuses on process automation and controls, utility upgrades, production optimization, plant re-tooling and energy efficiency improvements.
SNC-Lavalin has considerable experience with various contracting approaches including EPCM services, EPC, lump-sum turnkey and design-build, and it maintains specialized expertise to address various industrial plant requirements including material handling, dust control, machinery design, filling and packaging lines, clean room design, and validation.
Projects
Contacts
Sulphuric Acid Plant
SNC-Lavalin was chosen on February 7, 1995 after an international call for tenders to carry out EPC services for a 2,130 toone/day double absorption metallurgical gas acid plant on a turnkey basis. The key element in winning the project was a commitment to a very tight schedule. Mexicana required that the plant be ready for operation by October 5, 1996, only 19 months from the order date to startup. Our commitment was reinforced by Mexicana's experience with their first acid plant. The second largest plant in Latin America for acid production was successfully started up on time. After the performance test work was completed within the first month, the owner accepted the plant and is now operating it over the expected capacity. Client: Mexicana de Cobre S.A.
Country : Mexico
Verrerie du Languedoc Expansion Project
The Verrerie du Languedoc (VDL) near Nîmes, France produces 600 million glass bottles/yr, mostly for Perrier and San Pellegrino. VDL hired us to manage its expansion project, which involved adapting an existing oven, utility networks and other infrastructure to handle more capacity and a new production line. The plant remained operational throughout the process. Client: Verrerie du Languedoc
Country : France
Placoplatre's Gypsum Panel Production Site
We are supervising design and providing project management services at Placoplatre's gypsum panel production site in Vaujours, France. We demolished a 40,000 m2 plant and are building new buildings over an area of 75,000 m2, including a production line that ranks among the most efficient in the world. The refurbished site will be one of the world's largest gypsum panel plants, built to High Environmental Quality Standards to ensure harmonious integration with the environment and proper water management. Client: Placoplatre
Country : France
PSA Peugeot Citroën
We built a 22 000 m² mechanical unit for vehicle cradles, and an electrophoretic painting unit.Client: PSA Peugeot Citroën
Country :
Assembly Building for A380 Planes
Construction of the "Comète II " equipment and control bay for the fuselage forward sections of the Airbus A380. It involves three platform levels spanning over 5800 m², to provide access to the work doors for the jumbo jet's baggage hold and both passenger seating levels.Architect: Bodreau Architecture. Client : Airbus France
Country : France
Power Train Test Facility
PSA Peugeot Citroën awarded us a second turnkey contract at its Power Train Test Facility in Carrière-sous-Poissy, France. We will design and build a series of 20 complex test facilities, some of which will include new gas analysis and driving simulation technologies.Client: PSA Peugeot Citroën
Country : France
Basic engineering of the gas pipeline and for the pumping stations pertaining to the project GK-3 Hassi R'mel-Skikda - el Kala, in Algeria
Scope: Basic engineering and execution of the gas pipeline and compressor station as well as hydraulic and viability studies of the infrastructure. The scope included the preparation of the documents for the construction of the oil pipeline and pumping stations tender in Turnkey mode. The construction budget is over: 700.000.000 EUR. Client: SONATRACH
Country : Algeria
Sulphuric Acid Plant
SNC-Lavalin was chosen on February 7, 1995 after an international call for tenders to carry out EPC services for a 2,130 toone/day double absorption metallurgical gas acid plant on a turnkey basis. The key element in winning the project was a commitment to a very tight schedule. Mexicana required that the plant be ready for operation by October 5, 1996, only 19 months from the order date to startup. Our commitment was reinforced by Mexicana's experience with their first acid plant. The second largest plant in Latin America for acid production was successfully started up on time. After the performance test work was completed within the first month, the owner accepted the plant and is now operating it over the expected capacity. Client: Mexicana de Cobre S.A.
Verrerie du Languedoc Expansion Project
The Verrerie du Languedoc (VDL) near Nîmes, France produces 600 million glass bottles/yr, mostly for Perrier and San Pellegrino. VDL hired us to manage its expansion project, which involved adapting an existing oven, utility networks and other infrastructure to handle more capacity and a new production line. The plant remained operational throughout the process. Client: Verrerie du Languedoc
Placoplatre's Gypsum Panel Production Site
We are supervising design and providing project management services at Placoplatre's gypsum panel production site in Vaujours, France. We demolished a 40,000 m2 plant and are building new buildings over an area of 75,000 m2, including a production line that ranks among the most efficient in the world. The refurbished site will be one of the world's largest gypsum panel plants, built to High Environmental Quality Standards to ensure harmonious integration with the environment and proper water management. Client: Placoplatre
PSA Peugeot Citroën
We built a 22 000 m² mechanical unit for vehicle cradles, and an electrophoretic painting unit.Client: PSA Peugeot Citroën
Assembly Building for A380 Planes
Construction of the "Comète II " equipment and control bay for the fuselage forward sections of the Airbus A380. It involves three platform levels spanning over 5800 m², to provide access to the work doors for the jumbo jet's baggage hold and both passenger seating levels.Architect: Bodreau Architecture. Client : Airbus France
Power Train Test Facility
PSA Peugeot Citroën awarded us a second turnkey contract at its Power Train Test Facility in Carrière-sous-Poissy, France. We will design and build a series of 20 complex test facilities, some of which will include new gas analysis and driving simulation technologies.Client: PSA Peugeot Citroën
Basic engineering of the gas pipeline and for the pumping stations pertaining to the project GK-3 Hassi R'mel-Skikda - el Kala, in Algeria
Scope: Basic engineering and execution of the gas pipeline and compressor station as well as hydraulic and viability studies of the infrastructure. The scope included the preparation of the documents for the construction of the oil pipeline and pumping stations tender in Turnkey mode. The construction budget is over: 700.000.000 EUR. Client: SONATRACH